Description: Five full boxes with 4 leads each, one partial box with 2 leads, total of 22 leads
Price: 14.95 USD
Location: Jarrell, Texas
End Time: 2024-12-31T00:56:47.000Z
Shipping Cost: N/A USD
Product Images
Item Specifics
All returns accepted: ReturnsNotAccepted
Brand: scripto
Type: extra strong drawing leads refill
Lead Diameter: Unspecified
Material: Paper & Wood
Country/Region of Manufacture: United States
Modified Item: No
Vintage: Yes