Description: (6 Pack KIT) Kerr Lighting Millennium (6.0"W x 6.0"L) Product #: KMIL07-K6 We Ship Daily Monday - Friday Product is in New Condition with a 2 Year Manufacturer Warranty TJB-INC is the oldest Kerr Lighting Dealer/Installer in the USA (Since 1995). Our TJB-INC Construction Division has installed 1,000’s of these lighting fixtures throughout Southern New England. (We are based in Connecticut). Our tech support is second to none when it comes to proper installations of Kerr Lighting fixtures. Like all Kerr paver light products, they can be used in patios, walkways, pool decks, and driveways. Their rugged reinforced design can withstand the load of a passenger car or light commercial vehicle. The “turtle shell” lens with molded textured surface is easily removed when a bulb needs to be replaced. Includes (6) Kerr Lighting MILLENNIUM PAVER LIGHT Weather Resistant and Durable Shatterproof Plastic TIP: Use a deck lens as a template to cut holes in deck in order to get correct size holes for installation · Actual Production Dimensions: Length 5.875", Width 5.875", Height 2.40" · Weight: 1.5 lb each Shape: Rectangular Color: Frosted White/Clear Finish Type: Brushed Included Components: (6) Millennium Lighting Fixtures & (6) Lens Covers (6) 7-Watt Bulbs & (6) Lamp Sockets (12) Solderless Connectors & Clips50 feet of 16/2 Low-Voltage Cable(1) 100-Watt Transformer (Includes an integrated timer and photocell.) Special Features: Water, Snow, and Ice Resistant Energy Efficient Style: Traditional; Modern NOTE: A trick that we use at TJB-INC, is to place a white napkin on top of the area where you think a light should go. (You may need to use tape or a rock to keep the napkin from blowing away.) Then stand back and see how it looks. It is much easier to move napkins that it is to move light fixtures. Adjust as you feel necessary until you find a layout that you like. Then you will know how many lights you will need to order and install to complete your project. *** TJB-INC Kerr Lighting Installation Tips *** Thank you for purchasing Kerr Lights. We would like to share some installation tips to help make your installation worry free. · Each light comes with: Base, Lens, Socket(s), Bulb(s) & (2) Connectors (these will be either Brown Saddle Connectors, or Silicone Connectors). We recommend when using the brown saddle connectors, applying a dab of Di-Electric Grease on the connection points before crimping the connection closed. This will help seal out air and water from the connection points and prevent/slow corrosion of the connections over time. · Add up the output wattage of all of the bulbs (incandescent and/or LED) in your system. a. 6” x 9” lights come with (2) 7-watt bulbs, so each light has a 14-watt draw. 10 of these lights will draw 140-watts of power. Always add an additional 10% to your total. (140 + 14 = 154). b. Now look at the output of your transformer. Take 10% off the rated output. IE: 200-watt rated output would be actually 180-watts. c. Using this formula, as long as the adjusted total of wattage draw does not exceed the adjusted output wattage of the transformer, your system will last a long time. · There are several different ways to connect the lights to the power feed cable from the transformer. Choose the method that best suits your site. · The first is called “Daisy Chain”. This is where the power feed cable goes down along the edge of the installation and each light attaches on to this cable in succession. If using this connection method, be sure that there is less than 100 watts of total draw from the lights and less than 100’ of 16/2 cable from the transformer to the end of the run. If the run is longer than 100‘on your run, or greater than 100 watts of draw, then switch to larger 12/2 low voltage cable. If lining both sides of a walkway or driveway with lights, it would be better off running a power feed cable down along both sides of the installation area. This will help balance out the power draw. If not balanced, the lights closest to the transformer will be brighter and more yellow/white in color. The lights farthest away will be less bright and more of an orange/yellow in color. · The second is a “Loop Installation”. If the lights are going around a patio/pool deck or similar application, install the power feed cable from the transformer all the way around the installation area and then connect the end of the power feed cable back into the beginning of the power feed cable. The power supply is AC (Alternating Current) not DC (Direct Current with a + & - side), take care on tapping the end of the cable back into the top. Low voltage cable has both a smooth finish on one side of the outside insulation and a raised rib on the other. When doing a Loop Installation, you must connect the smooth to smooth and the ribbed to the ribbed. Otherwise, the circuit breaker in the transformer will continually trip and the system will not work. The advantage to the loop installation is that the available power to the lights is spread more evenly distributed and balanced throughout the system meaning, the lights will all be close to the same brightness and color. · The Third is a “Hub Installation”. For long cable runs with lots of lights to install, run multiple power feed cables to groups of fixtures that are all connected together. This Hub feature supplies power to smaller groups of lights balancing out the distribution, so the lights have the same brightness and color. · We recommend you install your wires from the transformer to each light connection, but do not install the light fixture yet. When the paver installation is brand new, a “dummy” paver is put in place of the light fixture when the polymeric sand is swept into the joints and then compacted. If the light fixtures are installed before the compaction step, the vibration from the compactor can break the filament of the light bulbs and they will not light up. If this happens, replacement T5 Wedge style bulbs will be needed to be purchased. NOTE: This is not covered under warranty. · When installing light bulbs into the Kerr fixtures, make sure to add a dab of Di-Electric Grease to the top of the socket before inserting the light bulb. This grease will help coat the electrical connection between the socket and the light bulb which prevents air and water from reaching the connections. This will help prevent corrosion and failure of the connections over time. · After installing the bulbs, use a gauze pad with rubbing alcohol to remove any di-electric grease or oils from your fingers from the surface of the bulb. Grease and oil left on the glass bulb can cause weak spots and pre-mature failure of the bulb (Incandescent or LED). · If installing the 6” x 9” Millennium, California, Camelot, or New Age light fixtures, the base plate will be larger than the 5-sided lens. This is so the flanges can tuck under surrounding pavers and keep the base section in place. When installing along the outside border, the flange towards the edge restraint will need to be trimmed with scissors or knife in order to properly fit. · Always check the connections and the transformer, making sure that all lights are connected and are working correctly before re-installing the top lens. · Once the system operation has been confirmed, then the lens cover can be installed. If installing the Millennium, California, Camelot, or New Age light fixtures, then care must be taken when placing the polymeric sand around the lenses. TJB-INC has found a pastry funnel works the best. It puts the sand exactly where it needs to be in just the right amount. While applying pressure to the top of the lens so it does not rise up, tap the adjoining pavers with a rubber mallet to help settle the sand correctly. Please read and follow the sand manufacturer’s instructions on the proper water activation of the product used. NOTE: Some require multiple light soakings while others require a single deep soaking. Make sure to save a few extra bags of this sand to have on hand if any repairs/maintenance is needed in the future. · As time goes by, dirt and unwanted vegetation can get inside of the light fixtures. TJB-INC recommends every year or two, opening the fixture and clearing any unwanted debris that might have accumulated inside. · A tip on removing an installed lens with hardened polymeric sand around the lens on the Millennium, California, Camelot, or New Age light fixtures: Polymeric sand can be softened by pouring hot water around the lens which makes the lifting up of the lens much easier. After the lens is removed, use a shop vacuum to remove the old polymeric sand. It cannot be reused! After completing the maintenance, re-install the lens and follow the directions in the preceding section.
Price: 309.99 USD
Location: Hamden, Connecticut
End Time: 2024-09-20T22:22:26.000Z
Shipping Cost: 32.59 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Light Color: Warm
Power Source: Hardwired
Size: N/A
Transformer Required: Yes, 12V AC or DC
Year Manufactured: 2024
MPN: KMIL07-10
Item Length: 5.875 Inches
Solar Powered: No
Smart Home Compatibility: N/A
Bulb Shape Code: T5
Control Style: Dial, Mechanical Control
Unit Type: Unit
Sensor Type: Light
Energy Star: A+++
Manufacturer Warranty: 2 Years
Item Height: 2.40 Inches
Voltage: 12 V
Style: Modern
Features: Energy Efficient, Energy Saving, Even Lighting, Weather Resistant
Unit Quantity: 6
Finish: Brushed
Item Width: 5.875 Inches
Lighting Technology: Incandescent
Number of Settings: 1
Color Temperature: 1500 - 2000 K Candle Light
EC Range: A+++ - G
Color: White
Item Diameter: 2.40 Inches
Material: Plastic
Number of Lights: 6
Installation Area: Outdoor
Mounting: Surface, Ground
Brand: Kerr Lighting
Type: Pathway
IP Rating: N/A
Assembly Required: Yes
Model: Kerr Lighting Millennium Cobble Light
Theme: Garden
Country/Region of Manufacture: United States
Power Consumption: 7 W
Item Weight: 1.5 lbs